Construction & Yard Material Calculators

A 50 × 12 ft gravel driveway with a 6 in base and a 4 in top takes about 30.8 tons of crushed stone, 3 truckloads. That’s the first of 30 free calculators here, each showing the math behind the number.

Gravel Driveway Layer Calculator

Base and surface gravel sized as separate layers, with compaction, tons and truckloads.

ft
ft
in
in
Edit assumptions & pricing
%
%
$
tons
50.0 ft 12.0 ft Surface Base 4 in 6 in
    Live measurement plan. Schematic, not to scale; values update as you edit.
    Estimated total — Enter project measurements to calculate.

    30 calculators, grouped by job

    Each one lists what the job needs to buy, not just a single number.

    Showing all 30 calculators

    Pavers & Patio

    Gravel & Stone

    Fence

    Concrete

    Soil & Landscaping

    Interior Materials

    Debris & Disposal

    Delivery & Payload

    Measurement & Conversion

    Masonry & Walls

    Roofing & Disposal

    Drainage

    How the numbers get worked out

    Each result shows the measurement, the allowances and the rounding that got it there.

    Measure

    Enter real dimensions. When the space isn’t one rectangle, add more areas or rooms.

    Adjust

    Change the density, coverage, waste or price whenever your supplier’s numbers differ from the defaults.

    Trace

    See the volumes and weights behind every quantity the plan tells you to buy.

    Take it with you

    Copy, share or print the plan for a supplier quote or a check on site.

    How we calculate and round

    You can change every material assumption

    A cubic yard of gravel is figured at about 2,800 lb here. Wet stone, a different grading or another quarry can change that. Start with the defaults, then type in your supplier’s number when you have it.

    Read the material notes
    MaterialPlanning density
    Crushed stone≈ 2,700 lb / cu yd
    Gravel≈ 2,800 lb / cu yd
    Topsoil≈ 2,000 lb / cu yd
    Mulch≈ 500–800 lb / cu yd
    Planning values only. Ask your supplier for the figure for their material.

    Measure before you order

    Short guides for the measuring part, before you open a calculator.

    Browse all measuring guides
    Planning limit

    Material estimate, not engineering approval

    These are material estimates. Local codes and site conditions can change what a job needs, and anything structural or safety-critical needs a qualified pro, not a calculator.

    Where the numbers come from

    Unit conversions such as 27 cubic feet per cubic yard are fixed. Densities, bag yields and coverage are planning assumptions, labeled as such and open to edit, because they change from one product to the next. When your supplier’s figure differs, theirs wins.

    See the sources and verification policy